Skip to content
  Download Brochure |
Hillsboro Technology Center

Hillsboro Technology Center

  • Home
  • Availability
    • Industrial Buildings G & H
    • Industrial Buildings C & D 100% Leased
    • Industrial Building E 100% Leased
    • Industrial Building F 100% Leased
    • Class A Office Building Features
  • Environmental Design
  • Photo Gallery
    • Industrial Buildings G & H
    • Industrial Buildings E & F
    • Industrial Building C & D
    • Class A Office Building
  • News
  • Contact

Butters and Bristol finish last 2 buildings and HTC is now 100 % complete with 900,000 sf of buildings

Butters and Bristol finish last 2 buildings and HTC is now 100 % complete with 900,000 sf of buildings.

Published January 7, 2022By admin
Categorized as Uncategorized

Leave a comment Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Butters and Bristol finish last 2 buildings and HTC is now 100 % complete with 900,000 sf of buildings
  • The Butters Industrial Team of Thomas J. Hotz and Brian T. Ahearn, CCIM have completed a new lease transaction totaling 89,638 square feet at Hillsboro Technology Center in Deerfield Beach, FL.
  • Bristol Group and Butters Deliver Phase III at Hillsboro Technology Park
  • Malcolm Butters was named one of the 2019 Power Leaders in the South Florida Business Journal.
  • Meet the Power Leaders in Real Estate – slideshow

Post navigation

Previous post

The Butters Industrial Team of Thomas J. Hotz and Brian T. Ahearn, CCIM have completed a new lease transaction totaling 89,638 square feet at Hillsboro Technology Center in Deerfield Beach, FL.

Developed by:

parnters_butters

Property & Building Features

  View Features

Brochure Download

  Download

Location

  View Map

© Copyright 2022. Butters Construction + Bristol Group. All rights reserved.